- it cost of $170 million to build
- it is supported by two 128 metre-high reinforced concrete towers
- the main span of the bridge is 345 metres
- the length of the deck is 805 metres
- the deck is fully supported by 128 steel stay cables, giving the bridge its distinctive appearance
- the bridge was built in 10 metre segments with each weighing 460 tonnes
- for every segment placed over the water, a segment was placed on land as a counter balance
- for the first time, the bridge is high enough to allow ships pass underneath.